Mercedes W163 + Mercedes-Benz cars of a class M (W163) + Governing bodies and methods of safe operation + Current leaving and service + Engine + Cooling systems, heating and air conditioner + A power supply system and production of the fulfilled gases + Systems of electric equipment of the engine + Manual box of gear shifting + Automatic transmission - Transmission line - Coupling Assessment of degree of wear of the conducted clutch plate Removal, installation and check of coupling Removal and installation of the main cylinder Removal and installation of the executive cylinder of coupling Removal of air from a hydraulic path of the drive of coupling + Driveshafts + Power shafts + Transfer case and differentials + Brake and auxiliary systems + Suspension bracket and steering + Body + Onboard electric equipment
|
Removal and installation of the executive cylinder of coupling
Details of installation of the executive cylinder of the drive of coupling
|
- Details of installation of the executive cylinder of coupling are shown on an illustration to which all references which are found in the text belong.
- Disconnect the hydraulic line (19) from the executive cylinder (1), having at once corked its open end.
- Turn out fixing bolts (20) and remove the executive cylinder (1) with a plastic washer (2).
- Installation is made upside-down, grease a cylinder pusher rod before installation with jellied lubricant and track correctness of hit in a reception nest of the bifurcate lever of switching off of coupling.
- In conclusion remove air from a hydraulic path (see the Section Removal of Air from a hydraulic path of the drive of coupling).
|
|
|
|