Mercedes M-Class W163

since 1997 release

Repair and operation of the car



Mercedes W163
+ Mercedes-Benz cars of a class M (W163)
+ Governing bodies and methods of safe operation
+ Current leaving and service
+ Engine
+ Cooling systems, heating and air conditioner
+ A power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Transmission line
+ Brake and auxiliary systems
- Suspension bracket and steering
   + Forward suspension bracket
   - Back suspension bracket
      Removal and installation of assembly of the back bridge
      Removal, dismantling and installation of back racks
      Removal and installation of the torsion bar
      Removal and installation of the lower cross lever
      Removal and installation of the top cross lever
      Remove also installation of a longitudinal extension
   + Steering
   + Suspension bracket geometry
+ Body
+ Onboard electric equipment


Removal and installation of the lower cross lever

Details of installation of the lower cross lever of a back suspension bracket

6j — Rack-mount assembly
7a — the Lower spherical support
94 — Nizhny Novgorod the cross lever
125a — the Bearing with a nut
125b — the Bearing
125 — the Remote plug

125d — the Bearing
125e — the Bearing
125f — the Bolt
And — Version 1
In — Version 2


 PERFORMANCE ORDER

In total самоконтрящиеся bolts and nuts are subject to replacement without fail!

  1. Details of installation of the lower cross lever of a back suspension bracket are shown on an illustration to which all references which are found in the text belong.
  2. Remove back wheels.
  3. Disconnect rack-mount assembly (6j) from the lower cross lever (94).
  4. Remove the bearing with a nut (125a) and take from the lever (94) a bolt (125f).
  5. Give fixing nuts, take axial bolts, separate the lever (94) from a stretcher and develop it down on a spherical support (7a).
  6. In case of need holding a spherical head by means of TORX key, release a support (7a) from the lever (94).
  7. Remove lower are cross the lever (94).
  8. Estimate a condition of a spherical support (7a) (see the Section Check of a Condition of Spherical Support of a Rotary Fist), in case of need remove a support (use an extractor) and make its replacement.
  9. Installation is made upside-down, - track that when landing the lever and tightening the bearing with a nut (125a) assembly of the back bridge settled down strictly horizontally.