Mercedes M-Class W163

since 1997 release

Repair and operation of the car



Mercedes W163
+ Mercedes-Benz cars of a class M (W163)
+ Governing bodies and methods of safe operation
+ Current leaving and service
+ Engine
+ Cooling systems, heating and air conditioner
- Power supply system and production of the fulfilled gases
   + Power supply system of petrol engines
   - Power supply system of diesel engines
      General information
      Checks of system of injection of fuel
      Service of components of an inlet air path
      Service of components of the drive of a butterfly valve
      Depletion of the fuel tank
      Removal and installation of the sensor of a reserve of fuel
      Removal of air from a contour of low pressure of a fuel path, - on the example of the series 612 engine
      Removal and installation of the preliminary fuel pump
      Removal and installation of the fuel pump of high pressure (FPHP)
      Removal and installation of the fuel distributive highway and nozzles
      Removal and installation of the sensor of pressure in the fuel highway
      Removal and installation of the electric locking valve, - model 163.113
      Removal and installation of the valve regulator of pressure of fuel
      Removal and installation of valvate assembly on models 163.128
      Removal and installation of a cooler of fuel on models 163.113
      Removal and installation of the module of management of fuel injection
      Removal and installation of the fuel tank
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Transmission line
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of the fuel pump of high pressure (FPHP)

Model 163.113

TNVD installation details on models 163.113 (the series 612 engine)

1 — the Basic arm
2 — the Line of return of fuel
3 — the Basic arm of the pressure head line
4 — the Transitional nozzle
5 — the Driving element

19 — TNVD
19/1 — the TNVD Pressure head line
19/3 — the Carving union
Y75 — the Electric locking valve


 PERFORMANCE ORDER

  1. TNVD installation details on models 163.113 (the series 612 engine) are shown on an illustration to which all references which are found in the text belong.
  2. Remove panels of finishing of a cover of a head of cylinders.
  3. Take off a belt of the drive of auxiliary units.
  4. Otboltite from TNVD (19) the pressure head line (19/1).
  5. Remove from pump assembly an arm (1).
  6. Disconnect the line of return of fuel (2) from TNVD (19).
  7. Remove the electric locking valve (Y75).
  8. Turn out fixing bolts and remove assembly of TNVD (19).

Do not open assembly of TNVD, - in case of need remove a driving element (5)!

  1. Disconnect from TNVD a connecting branch pipe (4).
  2. Installation is made upside-down. Do not forget to replace all sealing elements, track respect for purity of the interfaced surfaces.

The driving element is replaced complete with an intermediate asterisk of the TNVD drive (see the Head Dvigatel).

Model 163.128

TNVD installation details on models 163.128 (the series 628 engine)

1 — TNVD
2 — the Line of supply of fuel
3 — the TNVD Pressure head line
3a — the Carving union
4 — the Line of return of fuel
5 — the Bolt
6 — the Floating coupling of an advancing of an angle of injection

7 — the Sealing ring
8 — the Bolt
9 — the Preliminary fuel pump
10 — the Driving element
11 — the Sealing ring
12 — the Bolt
Y94 — the mix quality control Valve

TNVD installation details on models 163.128 (the series 628 engine)

1 — TNVD
6 — the Floating coupling of an advancing of an angle of injection

13 — the Intermediate asterisk of the TNVD drive with the centrifugal proofreader
14 — the Nest


 PERFORMANCE ORDER

  1. TNVD installation details on models 163.128 (the series 628 engine) are shown on illustrations to which all references which are found in the text belong.
  2. Remove a positioner of a butterfly valve with the top air sleeves.
  3. Otboltite from TNVD (1) the pressure head line (3) and the line of return of fuel (4).
  4. Disconnect a line of communication (shooter) from the valve of quality control of mix (Y94).
  5. Turn out bolts (5) and remove assembly of TNVD (1).

Do not open assembly of TNVD, - in case of need remove the floating coupling (6)!

  1. Estimate degree of wear of the floating coupling (6), in case of need make replacement.
  2. Installation is made upside-down, - track that at the TNVD installation the nest (13) of an intermediate asterisk was developed in the same direction, as a zero tag (arrow). Do not forget to replace a sealing element of a natyazhitel. Do not forget to replace all sealing elements, track respect for purity of the interfaced surfaces.