   Check of compression pressure in cylinders
   Check of the engine by means of the vacuum gage
   Replacement of a belt of the drive of auxiliary units and elements of the mechanism of its tension
   + Petrol models
   - Diesel models
      Removal and installation of the engine
      Removal and installation of covers of the GRM drive
      Replacement of a gas-distributing chain
      Removal and installation of components of the GRM drive
      Installation of basic position of camshafts
      Verification of the basic provision of a balancing shaft (only series 628 engines)
      Removal and installation of the GRM components
      Removal and installation of a head(s) of cylinders
      Removal and installation of an electric motor of shutdown of inlet port (series 612 engine)
      Removal and installation of a final collector
      Replacement of a forward epiploon of a bent shaft
      Removal and installation of a back face cover, replacement of a back epiploon of a bent shaft
      Removal and installation of a damper of tortional fluctuations / pulley of a driving belt
      Removal and installation of a flywheel / driving disk
      Removal and installation of support of a suspension bracket of the power unit
      Service of the lubrication system
+ Cooling systems, heating and air conditioner
+ A power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Transmission line
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of a final collector

M612

Details of installation of a final collector of the engine of a series 612


 PERFORMANCE ORDER

  1. Details of installation of a final collector of the engine of a series 612 are shown on an illustration to which all references which are found in the text belong.
  2. Remove primary catalytic converter (120/1).
  3. Remove a turbocompressor (110).
  4. On models remove a basic arm of the directing tube of the probe of measurement of the AT level from AT, - do not pick up the phone.
  5. Give самоконтрящиеся nuts (4) and remove a final collector (1).

Самоконтрящиеся nuts of fastening of a final collector are subject to replacement without fail!

  1. Check a condition of fixing hairpins, in case of need make replacement.
  2. Carefully smooth out the interfaced surfaces of a collector and the block of cylinders.
  3. Installation is made upside-down, - do not forget to replace sealing laying (2).

M628

Details of installation of final collectors of the engine of a series 628


 PERFORMANCE ORDER

  1. Details of installation of final collectors of the engine of a series 628 are shown on an illustration to which all references which are found in the text belong.
  2. Remove the corresponding turbocompressor.
  3. Give nuts (5) and remove a final collector (1/3).

Самоконтрящиеся nuts of fastening of a final collector are subject to replacement without fail!

  1. Check a condition of fixing hairpins (4), in case of need make replacement.
  2. Carefully smooth out the interfaced surfaces of a collector and the block of cylinders.
  3. Installation is made upside-down, - do not forget to replace sealing laying (2).